Return to Project Index
Arundel - Part 3 of 3


In Safely
CLick for large image

Limited room

We couldn't bring the boiler in as far as we would have liked because the building structure was in the way.

Careful preparation beforehand meant that we were in the only place it was possible to bring the boiler sufficiently in to lower it to the ground.

We would have preferred more room to manoeuvre but we didn't have it.

We had to take care to not knock our lifting beam support - something easy to do that would mean disastrous results.


All In and Drop

Our team had to keep the guy cables taut to stop any swinging about in any direction.

Particularly when the lifting stops and starts the boiler keeps going of its own accord, we allow for this as we move but also ensure all of the team are alert, vigilant and ready to respond.

To do the job well it takes a good team who know their job - that's MRI London.

Click for large image


Click for larger image

Installed

The boilers were placed on their foundations and made secure.

The section of wall we removed for access was replaced and made good.

MRI London often find the size of the hole and the size of the heavy plant are about the same - and there is nothing you can do about either.

If it is possible MRI London will do it - if it's not possible... we've done that before and we'll find a way to do it again.


Part 2 of 3
Return to Projects

Home
Plant
Projects
Portfolio
Contact