Return to Project Index
CGNU Building - Part 1


Part One - Road Closure
closed road

MRI London create alternative access

It's easy enough to use Heras Fencing to close roads, it's harder to ensure access for those that need it.

In this case MRI London had to remove permanent street bollards to create road access for vehicles to the surrounding buildings.

Temporary walkways for pedestrian access were built.

We were pleased that we received no complaints from business residents or from the general public.


Crane weight

Due to underground parking facilities below road level we had to underpin the road to take the weight of the crane.

This is the same crane used to lift the Millennium Wheel into place.

Correct underpinning was vital, if the roadway had given in and the crane toppled it would have been a literal disaster.

MRI London's experience came to the fore and the work was finished promptly and correctly.

crane and cgnu


cgnu lift chiller

Heavy loads - confined space

Working within a confined space is everyday to MRI London.

Because of the location and size of heavy plant that MRI London remove or install we usually find we have to use the full resources of our extensive experience to find the best solution.

You want the job done - MRI London can do it.

You want it done efficiently and with minimum trouble - MRI London do that too.


 Index

More - Part 2

Home
Plant
Projects
Portfolio
Contact