Going Down
Above the place where the new plant was needed we cut another hole and
built an A frame over the top.
Once the plant was taken over the roof on the tracks we laid, it had
to be lifted into the building and lowered.
Although close together the roof team and the inside team are not in
direct contact.
Again, through team work and experience, MRI accomplished the task.
|