Saffron Hill - Part 3 of 3


Road Closure (3a)
Click for large image

Side Street - Complete Closure

We always try to operate from the side of the building that causes minimum inconvenience - something that is appreciated by all those who work around you.

Our work ranges from partial road closure to closing an entire street for 3 weeks.

We are aware of all the limitations and restrictions so always endeavour to do the best we can in the most trying of circumstances.


The Lift (3b)  

Large Loads

Our experience with rigging and lifting means we are fast and effective - both being very necessary for you and all businesses around you.

We don't claim to please all of the people all of the time but we do claim to keep all problems to the absolute minimum possible.

When the load arrives our trained operatives quickly put up the rigging and prepare for the lift.

Speed and care are both important, because we know what we are doing MRI London do both.

Click for large image


Click for large image

Smaller stuff

In-between the large plant being lifted into place we had several smaller items to handle.

To use the allocated time time effectively we took great care to ensure that as one left another took it's place.

Each task had to be completed quickly to avoid delays for the next load, which would knock on and ultimately mean one lorry being unloaded while another one waits.

With proper planning and a realistic idea of how long each stage would take meant MRI London completed the task on time.


Part 2 of 3