| Delivery and Removal | ||
Using our own plant and transport means we can work around a timetable to suit you. Delivery and removal are carefully coordinated to make the best use of our, and your, time.
At Enfield Business Park we need to remove the heavy plant and take out the old brickwork. Leaving the site clear and safe. |
||
We use a combination of supports below and mats above.
The mats spread the weight over a wider area keeping well within the safety limits of the structure.
Even though we have all the specification and know we are within the limits of the weight bearing it still requires careful observation and monitoring - just in case!
We have in the past been given the wrong limitations so we always trust with our eyes open. Many years experience means we see any problems and can take immediate action. |
||
| Delivery - On Site | |
We offer a full pick-up and delivery service as part of the job we are contracted to do or as a separate service.
Our crane lorries and skilled operatives are available for hire.
Even when we are on a part contract we still maintain the high standards of service, safety and efficiency that all our clients expect from their previous experiences of working with MRI London. |
| Delivery - Lifting | ||
Once the public area has been screen off we are ready to lift the new chiller to the roof. It takes care, co-ordination and team work.
Our permanent staff have many years experience in a wide variety of lifting and removal work .
Experience of working together means our team is fast effective and above all, safe.
|
||
![]() |
||
| The Odeon | ||
| High Street
Our task here is to remove and replace a chiller unit at the Colchester Odeon.
Access was only possible from the busy High Street. The local Council were very concerned about disrupting the local businesses and flow of traffic because it means complete road closure .
Planning ahead means we can move in and out with the minimum disruption for all concerned.
|
||
| Lifting Blind - Over The Top | ||
Once past a certain point those on the High Street side would be working blind. Relying on directions from those on the roof.
Our team is fully qualified and experienced in working this way. Close contact and co-ordination is essential for a successful lift . Our skilled team understand the job from both points of view so communication between the roof and the ground is clear and effective.
Teamwork is always important – with a blind lift it is essential.
|
||
| Pizza Express | |
Partial Road Closure, Upper Street Islington
In a busy part of London there are severe restrictions for any work undertaken and this was certainly no exception.
Transport for London (TfL) agreed to a part road closure but would allocate just one hour to replace two Air Conditioning units. Planning and preparation before the job was extensive and submitted to TfL prior to agreement.
Only when the authorities were confident with MRI London's proposal would they sanction the work.
|
One Hour Time limit
Even a part road closure causes immense disruption so we were given a one hour time slot - from 9 to 10 am - to remove and replace both units.
MRI London's experience meant effective and detailed planning beforehand to stay within the strict time limit.
On the day the work was completed in a little over half the allocated slot to the satisfaction of everyone involved. |
||
|
||
| Windmill Hill | ||
As access to this domestic property was along a minor road the size of crane was limited.
The crane had to be within range which meant it would stand on a slope - in short you can't have cranes operating on a slope. A fast and temporary solution is needed to keep the crane level and secure. There can be absolutely no movement from the supports to ensure a safe lift. |
||
The Right Place
|
||
The support sleepers must be exactly in place to spread the weight of
the crane's jacks correctly and evenly.
Provision is made to let the crane drive into place before the jacks are used, this must be level and straight.
Accuracy and care are essential. If the supports are not even the crane will be unstable and unsafe. Careful measurement and placement mean the lift went without a hitch.
|
|
|